Washington · Architect seal requirements

Washington Architect seal requirements: size, wording, and the rule that sets them

As of

Architects in Washington seal under WAC 308-12-081 (Do I need a stamp or seal?), administered by the Washington State Board for Architects. The seal reads “Registered architect, state of Washington”. No size is stated. The seal must be of the design authorized by the board, and deviations are not allowed.

WAC 196-23-070 is "Signature", not the seal rule; the seal is WAC 196-23-010 and its usage is WAC 196-23-020. WSR 25-02-004, filed December 18, 2024 and effective January 18, 2025, amended WAC 196-23-010, but it was an expedited, non-substantive rule making that changed pronouns only. The illustrated designs are printed in the certified PDF of the section, not in the HTML version.

Washington Architect seal

Legend
“Registered architect, state of Washington”
Diameter
No size is stated. The seal must be of the design authorized by the board, and deviations are not allowed.
Expiration date
The seal bears the architect's name, registration number, the legend "Registered Architect" and the name of this state. Sealing after the certificate expires is unlawful, but no date goes on the seal.(RCW 18.08.370(2); WAC 308-12-081)
Signature date
Both operative provisions require technical submissions to be sealed and signed only; neither adds a date. The engineers' dating rule, WAC 196-23-020(1), belongs to a different chapter and a different board and does not carry across.(RCW 18.08.370(2); WAC 308-12-081)
City on seal
The board-authorized design carries name, license number and legend, and "Deviations are not allowed."(RCW 18.08.370(2); WAC 308-12-081)
  • Every architect licensed in the state of Washington must have a seal of design authorized by the board, bearing the registrant's name, license number and the legend "Registered architect, state of Washington." An example of the board-authorized seal appears in the rule, and deviations are not allowed.(WAC 308-12-081)
  • All technical submissions required for building permits or regulatory approvals that are filed with authorities having jurisdiction must be signed and sealed.(WAC 308-12-081)
  • Drawings prepared by the architect must be signed and sealed on each sheet.(WAC 308-12-081(1))
  • Specifications and other technical submissions need only be sealed on the cover, title page, and all pages of the table of contents.(WAC 308-12-081(2))
  • The seal may be electronic.(WAC 308-12-081(3))
  • The architect rule requires signing and sealing and imposes no dating requirement. The engineers' rule does require a date; it does not carry across.(WAC 308-12-081; WAC 196-23-020(1))

Washington architect seal questions

Which board licenses Washington architects and sets the architect seal?

The Washington State Board for Architects, administered through the Department of Licensing — not the engineers' board. Architects are registered under chapter 18.08 RCW and seal under WAC 308-12-081, while chapter 196-23 WAC opens by reaching only "individuals licensed in accordance with chapter 18.43 RCW", the engineering and land surveying chapter. Nothing in the engineers' rule crosses over: not its "registered professional engineer" legend, not its illustrated designs, and not its requirement that every final document carry a date of signature. (RCW 18.08.370(2); WAC 308-12-081; WAC 196-23-010)

Does a Washington architect seal say "Licensed Architect"?

No. RCW 18.08.370(2) fixes the wording as the legend "Registered Architect" together with the name of this state, and the board's rule prints it as one string: the seal bears the registrant's name, license number and the legend "Registered architect, state of Washington." The rule adds that an example of the board-authorized seal appears in it and that "Deviations are not allowed", so dropping "Registered" or substituting "Licensed" leaves the authorized design. What the rule does not fix is the diameter — no figure appears in WAC 308-12-081 or anywhere in chapter 18.08 RCW, so any inch measurement quoted for a Washington architect seal comes from somewhere other than the rule. (RCW 18.08.370(2); WAC 308-12-081)

Does a Washington architect have to date a sealed drawing?

The architect's own provisions never ask for a date. RCW 18.08.370(2) requires technical submissions filed with public authorities to be "sealed and signed by the architect", and WAC 308-12-081 requires signing and sealing, defines what counts as a signature, and directs that the handwritten or digital identification be "[p]laced across the seal/stamp of the licensee" — with no dating requirement in either. The date licensees remember belongs to the engineers' and land surveyors' rule, WAC 196-23-020(1), which is a different board's chapter. An authority having jurisdiction can still ask for a date as a condition of its own approval. (RCW 18.08.370(2); WAC 308-12-081(4); WAC 196-23-020(1))

Must a Washington architect seal work exempt from architect licensing?

Yes, if it goes to a public authority. WAC 308-12-081 states that "Without exception, these stamping requirements apply to all work filed with public authorities you prepare or review, or that is prepared under your personal supervision by persons under your direction and control, regardless whether the work is exempt from the licensing requirements found in RCW 18.08.410." The exemption decides whether an architect was required for the project, not whether an architect who prepared or reviewed the work signs and seals it. (WAC 308-12-081; RCW 18.08.410)

Can a Washington architect seal drawings prepared by a subcontractor?

Yes, and the rule names the three ways. WAC 308-12-081 lets you sign and seal drawings prepared by your regularly employed subordinates and reviewed by you; by an individual or firm under direct subcontract with you, where you have reviewed and coordinated the preparation of the work or integrated it into your own technical submissions; or in collaboration with an architect licensed in a jurisdiction the board recognizes, where a contractual agreement exists between you. The price is stated in the same breath — by signing and sealing you become the architect of record and are responsible to the same extent as if you had prepared the submissions yourself. Prototypical documents run on a separate track: RCW 18.08.370(3)(b) requires written permission from the architect who prepared or sealed them and from the legal owner before you adapt them. (WAC 308-12-081; RCW 18.08.370(3))

Generate a Washington Architect seal to this specification

Board approved

Your Washington Architect seal from pedigitalstamps.com meets every requirement on this page — the required wording and the layout set out in WAC 308-12-081 (Do I need a stamp or seal?). Fill in your details and download it in seconds.

Every format you need is included — PNG, PDF, SVG and CAD — ready to place in Bluebeam, Acrobat or AutoCAD.

Loading the seal generator…
Open the Washington Architect stamp generator

Seal requirements in other states