Generate digital Washington Architect stamps instantly
- STATE BOARD APPROVED
- HIGH-QUALITY FILES IN VARIOUS FORMATS
- INSTANT ACCESS
- FREE-OF-CHARGE REVISIONS
Your board-compliant seal will be ready for download after purchase
Your board-compliant seal will be ready for download after purchase
Board approved
Your Washington Architect seal from pedigitalstamps.com meets every requirement on this page — the required wording and the layout set out in WAC 308-12-081 (Do I need a stamp or seal?). Fill in your details and download it in seconds.
WAC 196-23-070 is "Signature", not the seal rule; the seal is WAC 196-23-010 and its usage is WAC 196-23-020. WSR 25-02-004, filed December 18, 2024 and effective January 18, 2025, amended WAC 196-23-010, but it was an expedited, non-substantive rule making that changed pronouns only. The illustrated designs are printed in the certified PDF of the section, not in the HTML version.
Full Washington Architect seal requirements, with every citation →
File formats
HIGH-QUALITY RASTER FORMAT
VECTOR FORMAT, INFINITELY SCALABLE
UNIVERSAL DOCUMENT FORMAT
AUTOCAD COMPATIBLE FORMAT
PROFESSIONAL PRINT FORMAT
How it works
Select your state & profession
Add your name & license number
Adjust the text size using the controls
Select your discipline
Add your signature & customize (optional)
Download instantly to your computer
Software compatibility


Who we are
Our digital Washington Architect stamp generator creates instant state-approved electronic architect stamps. Our platform provides full customization of your digital seal, including an option to add your signature. Professional Engineer (PE) stamps, Architect stamps, and Land Surveyor stamps are available for immediate download after customization. There is no waiting. Every electronic professional seal we generate is 100% compliant with state board requirements, ensuring your digital stamp meets all necessary standards.
State boards




FAQ
Frequently asked questions about Washington digital architect stamps and seals.
Once you are licensed in Washington, you can generate your seal here and download it immediately. Fill in the form and position your signature if you want one. The layout follows WAC 308-12-081 (Do I need a stamp or seal?), which is the provision the Washington State Board for Architects will measure the seal against.
Washington’s architect stamp rule is WAC 308-12-081 (Do I need a stamp or seal?), administered by the Washington State Board for Architects, a different body from the engineering board. The seal must carry “Registered architect, state of Washington”, and no size is stated. The seal must be of the design authorized by the board, and deviations are not allowed.
A further 6 requirements, each tied to the subsection that imposes it, are itemised in the Washington requirements section on this page.
WAC 308-12-081 (Do I need a stamp or seal?) governs the Washington architect’s seal but does not prescribe a diameter. Sizes quoted for Washington elsewhere generally come from stamp suppliers’ catalogues rather than from the rule. What the rule does require is that your name and license number stay clearly legible.
The Washington State Board for Architects, administered through the Department of Licensing — not the engineers' board. Architects are registered under chapter 18.08 RCW and seal under WAC 308-12-081, while chapter 196-23 WAC opens by reaching only "individuals licensed in accordance with chapter 18.43 RCW", the engineering and land surveying chapter. Nothing in the engineers' rule crosses over: not its "registered professional engineer" legend, not its illustrated designs, and not its requirement that every final document carry a date of signature. (RCW 18.08.370(2); WAC 308-12-081; WAC 196-23-010)
No. RCW 18.08.370(2) fixes the wording as the legend "Registered Architect" together with the name of this state, and the board's rule prints it as one string: the seal bears the registrant's name, license number and the legend "Registered architect, state of Washington." The rule adds that an example of the board-authorized seal appears in it and that "Deviations are not allowed", so dropping "Registered" or substituting "Licensed" leaves the authorized design. What the rule does not fix is the diameter — no figure appears in WAC 308-12-081 or anywhere in chapter 18.08 RCW, so any inch measurement quoted for a Washington architect seal comes from somewhere other than the rule. (RCW 18.08.370(2); WAC 308-12-081)
The architect's own provisions never ask for a date. RCW 18.08.370(2) requires technical submissions filed with public authorities to be "sealed and signed by the architect", and WAC 308-12-081 requires signing and sealing, defines what counts as a signature, and directs that the handwritten or digital identification be "[p]laced across the seal/stamp of the licensee" — with no dating requirement in either. The date licensees remember belongs to the engineers' and land surveyors' rule, WAC 196-23-020(1), which is a different board's chapter. An authority having jurisdiction can still ask for a date as a condition of its own approval. (RCW 18.08.370(2); WAC 308-12-081(4); WAC 196-23-020(1))
Yes, if it goes to a public authority. WAC 308-12-081 states that "Without exception, these stamping requirements apply to all work filed with public authorities you prepare or review, or that is prepared under your personal supervision by persons under your direction and control, regardless whether the work is exempt from the licensing requirements found in RCW 18.08.410." The exemption decides whether an architect was required for the project, not whether an architect who prepared or reviewed the work signs and seals it. (WAC 308-12-081; RCW 18.08.410)
Yes, and the rule names the three ways. WAC 308-12-081 lets you sign and seal drawings prepared by your regularly employed subordinates and reviewed by you; by an individual or firm under direct subcontract with you, where you have reviewed and coordinated the preparation of the work or integrated it into your own technical submissions; or in collaboration with an architect licensed in a jurisdiction the board recognizes, where a contractual agreement exists between you. The price is stated in the same breath — by signing and sealing you become the architect of record and are responsible to the same extent as if you had prepared the submissions yourself. Prototypical documents run on a separate track: RCW 18.08.370(3)(b) requires written permission from the architect who prepared or sealed them and from the legal owner before you adapt them. (WAC 308-12-081; RCW 18.08.370(3))