Generate digital Alabama Land Surveyor stamps instantly
- STATE BOARD APPROVED
- HIGH-QUALITY FILES IN VARIOUS FORMATS
- INSTANT ACCESS
- FREE-OF-CHARGE REVISIONS
Your board-compliant seal will be ready for download after purchase
Your board-compliant seal will be ready for download after purchase
Board approved
Your Alabama Land Surveyor seal from pedigitalstamps.com meets every requirement on this page — the required wording, the layout and the diameter set out in Ala. Admin. Code r. 330-X-11-.02 (Seal Of The Licensee). Fill in your details and download it in seconds.
Chapter 330-X-11 is still published under the Board's former name, Alabama State Board of Registration for Professional Engineers and Land Surveyors. Seals obtained before the rule was adopted that conform to prior Board rules remain acceptable.
Full Alabama Land Surveyor seal requirements, with every citation →
File formats
HIGH-QUALITY RASTER FORMAT
VECTOR FORMAT, INFINITELY SCALABLE
UNIVERSAL DOCUMENT FORMAT
AUTOCAD COMPATIBLE FORMAT
PROFESSIONAL PRINT FORMAT
How it works
Select your state & profession
Add your name & license number
Adjust the text size using the controls
Select your discipline
Add your signature & customize (optional)
Download instantly to your computer
Software compatibility


Who we are
Our digital Alabama Land Surveyor stamp generator creates instant state-approved electronic land surveyor stamps. Our platform provides full customization of your digital seal, including an option to add your signature. Professional Engineer (PE) stamps, Architect stamps, and Land Surveyor stamps are available for immediate download after customization. There is no waiting. Every electronic professional seal we generate is 100% compliant with state board requirements, ensuring your digital stamp meets all necessary standards.
State boards




FAQ
Frequently asked questions about Alabama digital land surveyor stamps and seals.
Once you are licensed in Alabama, you can generate your seal here and download it immediately. Fill in the form and position your signature if you want one. The layout follows Ala. Admin. Code r. 330-X-11-.02 (Seal Of The Licensee), which is the provision the Alabama Board of Licensure for Professional Engineers and Land Surveyors will measure the seal against.
Alabama’s land surveyor seal rule is Ala. Admin. Code r. 330-X-11-.02 (Seal Of The Licensee), administered by the Alabama Board of Licensure for Professional Engineers and Land Surveyors. The seal must carry “Licensed Professional Land Surveyor”, and circular in form and from 1-5/8 to 2 inches in diameter.
A further 3 requirements, each tied to the subsection that imposes it, are itemised in the Alabama requirements section on this page.
Circular in form and from 1-5/8 to 2 inches in diameter. This is set by 330-X-11-.02(2).
No. What the statute requires is the licensee's name, the licensure number and the legend "licensed professional land surveyor," and the Board's own FAQ answers this directly: it is not necessary to have the PE or PLS in front of the number as long as the stamp reads Professional Land Surveyor. The words are what the rule turns on, not the abbreviation. (Ala. Code § 34-11-7(c); Alabama BELS FAQ, "What does my stamp need to look like?")
No. Each map, plat or chart sheet must be signed, sealed and dated by the licensee who prepared it or under whose responsible charge it was prepared. The shortcut that lets a licensee seal only the title or index sheet is written for reports and specifications bound in one volume, and it does not extend to plats. (Ala. Admin. Code r. 330-X-11-.03(3)(a)-(b))
The opposite. Any revision to a document carrying a licensee's seal and signature must be described and dated, and the original seal and signature shall not be removed. If someone other than the original licensee made the revisions, the licensee in responsible charge of those revisions signs and seals them as well, alongside the seal already there. (Ala. Admin. Code r. 330-X-11-.03(5))
Drawings, plats, reports or documents that do not require certification may be transmitted electronically only after the generated seal is removed, and the rule dictates what replaces the signature and date: "This document originally issued and sealed by (name of licensee), P.E. #______/P.L.S.#______ on (date of sealing). This document should not be considered a certified document." (Ala. Admin. Code r. 330-X-11-.03(8))